Aerial view of The Summit mixed-use master planned development surrounded by forest and lakes, large-scale placemaking and wayfinding signage project by RSM Design

Mt. Hope, West Virginia

The Summit Bechtel Reserve

Forging Connection and Exploration for Scouts

Exterior entry monument sign for Summit Bechtel Reserve with dimensional weathered steel letters and Boy Scouts of America emblem on reclaimed wood wall, placemaking signage design by RSM Design

Project info

Adventure, discovery, and community come alive at The Summit Bechtel Reserve

Project timeline graphic for Summit Bechtel Reserve wayfinding and signage design from 2008 design charette through 2019 World Scout Jamboree, long-term environmental graphic design project by RSM Design
Summit Bechtel Reserve logo with Boy Scouts of America fleur-de-lis emblem on textured terra cotta background, brand identity and environmental graphic design by RSM Design
Animated GIF of custom outdoor recreation pictogram icons including hiking figures, wayfinding symbol design for Summit Bechtel Reserve by RSM Design

The Summit Branding

Summit Bechtel Reserve and 2017 National Scout Jamboree brand identity style guides displayed on tablets, showing logo variations, color palettes, activity icons, and wayfinding symbols, environmental graphic design by RSM Design
Skateboarder riding inside large concrete pipe tunnel branded with The Park signage at Summit Bechtel Reserve, large-scale recreational facility environmental graphic design by RSM Design
Large-scale perforated metal shooting sports activity sign with silhouette pictogram at Summit Bechtel Reserve, outdoor wayfinding and environmental graphic design by RSM Design
Yellow Scout Crossing pedestrian warning sign with hiker pictograms above crowd of Boy Scout Jamboree attendees at Summit Bechtel Reserve, custom outdoor wayfinding signage design by RSM Design

Every identity element and sign is crafted to turn the landscape into a map of expedition and adventure.

Dimensional circular archery activity sign with layered target design and archer silhouette pictogram at Summit Bechtel Reserve, sculptural outdoor wayfinding signage by RSM Design
Large-scale dimensional concrete Low Gear mountain biking area letters with scouts and instructor gathered around at Summit Bechtel Reserve, experiential placemaking signage design by RSM Design
Suspended reclaimed wood dimensional letters spelling The Canopy hanging from steel cable at Summit Bechtel Reserve, creative outdoor placemaking signage design by RSM Design
Multi-directional campground wayfinding blade sign on wood post directing visitors to Base Camp C, E, F and The Mountain at Summit Bechtel Reserve, outdoor signage system design by RSM Design
Close-up of carved and charred Boy Scouts of America eagle emblem on reclaimed wood wall at Summit Bechtel Reserve, detailed environmental graphic and signage craftsmanship by RSM Design
Branded orange shipping container with large-scale The Trax BMX activity signage and cyclist pictogram at Summit Bechtel Reserve, experiential environmental graphic design by RSM Design
Weathered COR-TEN steel cut-out entry monument sign for Christen National High Adventure Base at Summit Bechtel Reserve, rugged outdoor placemaking signage design by RSM Design
Thousands of scouts tossing branded orange and white beach balls at National Scout Jamboree opening ceremony at Summit Bechtel Reserve, large-scale event branding and experiential design by RSM Design